• 20%

  • 21%

  • 22%

  • None of these


21%

A group of 12 men can do a piece of work in 14 days and other group of 12 women can do the same work in 21 days. They begin together but 3 days before the completion of work, mans group leaves off. The total number of days to complete the work is:

A group of men decided to do a job in 4 days. But since 20 men dropped out every day, the job completed at the end of the 7th day. How many men were there at the beginning?

A group of workers was put on a job. From second day onwards, one worker was withdrawn each day. The job was finished when the last worker was withdrawn. Had no worker been withdrawn at any stage, the group would have finished the job in 55% of the time. How many workers were there in the group?

A gun is fired at a distance of 1.34 km from Geeta. she hear the sound after 4 second . the speed at which sound travels is .

A hall is 15 m long and 12 m broad. If the sum of the areas of the floor and the ceiling is equal to the sum of the areas of four walls, the volume of the hall is:

A has 50 coins of 10 paise denominations. While B has 10 coins of 50 paise denominations. C has 20 coins of 25 paise denominations while D has 25 coins of 20 paise denominations. The average number of paise per person is :

A has 8 pencils, B has 10 pencils and C has 15 pencils, then the average number of pencils with them are

A heap of pebbles when made up into group of 32, 40, 72, leaves the remainder 10, 18 and 50 respectively. Find least number of pebbles in the heaps.

A hexagonal prism has 18 edges. How many Vertices does it have ?

A highway loads to the foot of a 50 m tall tower. From the top of the tower, the angles of depression of two cars on the highway are 30° and 60°. What is the distance between the two cares ?

New Questions
New Blog Post
Network Questions