• 4 days

  • 6 days

  • 7 days

  • 5 days


Given that 6 men and 8 boys can do a piece of work in 10 days 26 men and 48 boys can do the same in 2 days As the work done is equal, 10(6M + 8B) = 2(26M + 48B) 60M + 80B = 52M + 96B => M = 2B => B = M/2 тАжтАж(1) Now Put (1) in 15M + 20B => 15M + 10M = 25M Now, 6M + 8B in 10 days => (6M + 4M) 10 = 100M Then D(25M) = 100M => D = 4 days.